Moving
mouse over canned comment will cause the comment
to be reverse highlighted. Clicking canned comment
will enter it into the comment section of the
inspection report.
Comments are instantly saved as are the Status:
entries.
Contractors are given access to the inspection Status and
Comments via the Internet. In the case of the City
Of Houston, TX reports are available to contractors
by internet and automated telephony reporting
systems.
InterSpect©
provides
instant reporting results directly from an inspection
site.
At the City of Houston results are given to
contractors in as little as
12 minutes to accommodate the City of Houston's
mainframe computer workload. City of Houston
reporting is completed within 24 hours of inspection.
InterSpect©
can provide reporting
to a contractor with instant results
from the
inspection
site.
|
|
Pick
a comment: |
1.
Location Not
Staked/Dimensions
|
2.
Needs Certified Survey
|
3.
Does Not Comply with
Frontage...
|
4.
Needs Building Permits
|
5.
Needs County Permits
|
6.
Over Sign Count
|
7.
Encroachment Of
Easement/Utility R-O-W
|
8.
S.O.B.
|
9.
Visibility Problem
|
10.
Additional Permits
Required
|
11.
Wrong
Location/Materials
|
12.
Cancelled
|
13.
No Contractor/Material
On Jobsite...
|
14.
Hole Does Not Match
Drawings
|
|
|
|
|